Sealcoating

Protect. Restore. Extend.

Sealcoating protects your driveway from the water, chemicals, traffic and weather that break asphalt down over time. Applied every two to three years, it extends the life and integrity of your pavement while restoring a deep-black finish. Our meticulous process is what makes the difference, and it's why our driveways last.

Hand-Brushed Application

Our premium sealer is worked into the pores of the asphalt by hand with a Prostran© nylon brush.

Full Preparation Included

We edge the grass, torch and prime oil stains, and wire-brush the entire surface before any sealer goes down.

Premium Sealer Formula

Our products are specially formulated for deep color and durability, never bought off the shelf.

MPCA Guidelines Followed

We follow Minnesota Pollution Control Agency guidelines for a safer product free from environmentally harmful additives.

Never Over-Diluted

A consistent-mix design ensures optimal adhesion and uniform appearance across every paved area of your property.

Why Homeowners Choose BorderLines Sealcoating

  • Protection from water, chemicals, traffic and weather
  • Extended pavement life and integrity
  • Deep-black color that enhances curb appeal
  • Clean, manicured edges along the entire driveway
  • Non-tracking, slip-resistant finish
  • Polymers that add strength and elasticity through freeze and thaw cycles
Sealcoated residential driveway

Our Sealcoating Process

  1. 1

    Edge the Sides

    We cut overgrown grass along the blacktop with a steel blade edger so the sealer reaches down the sides for a complete seal.

  2. 2

    Torch and Prime

    Oil stains are torched and treated with an oil spot primer so oil doesn't bleed up through the new sealcoat.

  3. 3

    Scrub the Surface

    We thoroughly scrub the pavement with a wire brush, exfoliating the entire surface — a step many companies skip.

  4. 4

    Hand Apply Sealer

    Our technicians brush the sealer back and forth into the asphalt, keeping it off neighboring sidewalks, walkways and vegetation.

  5. 5

    Block and Cure

    We close off the newly sealed area with banner tape and recommend leaving it up at least 48 hours to cure.

Frequently Asked Questions

Request a Free Estimate

Fill out the form and a BorderLines team member will contact you to confirm the details.

    Ready to Protect Your Pavement?

    Our team is ready to help you protect your investment.

    Request a Free Estimate